Wind Turbine

Benslimane - Morocco

Key Facts

  • Location:

    Benslimane – Morocco

  • Start Date:

    April 2015

  • Duration:

    1 month

Project Description

 The project consists of the installation of one on-grid wind turbine of 250 KW in the Benslimane area along with connecting it to the medium voltage network.

 Advanced Vision Morocco has executed the supply & installation of this turbine alongside the support system and the construction of the electrical room housing the control device inverters.